AramoniReport   
_______________________________

MEXICO INFRASTRUCTURE TENDERS
(Updated June 17, 2018)
_______________________________

CONTENTS
NG Underground Storage
NG Network Projects
HVDC Transmission System
Pemex's Major Tenders
_______________________________


CENAGAS: STRATEGIC UNDERGROUND STORAGE FOR NG

PROJECT PROGRAM (preliminary)
phase 1. Data access: May-Jun 2018 (now open at CNH)
phase 2. EOI (on a site basis): by 30-Jul-2018
phase 3. Tender docs: Sep 2018
phase 4. RFPs: Oct 2018

PROPOSED SITES (4)

1. field: ACUYO
location: Chiapas
distance to pipeline network: 20km
number of wells: 1
production period: 1978-2004
hydrocarbons: Light oil and gas
original volume of oil: 1.5mbls
cumulated production of oil: 0.2mbls
original volume of gas: 51bcf
cumulated production of gas: 0.8bcf
formation: mid Cretaceous
lithology: Limestones
thickness: 33m
porosity: 12%
water saturation: 36%
permeability: 274mD
depth: 3700m
temperature: 101ºC
reservoir pressure (original): 396kg/cm2

2. field: BRASIL
location: Tamaulipas
distance to pipeline network: 0km
number of wells: 58
production period: 1949-2006
hydrocarbons: Gas and condensates
original volume of gas: 553bcf
cumulated production of gas: 418bcf
formation: cold Marine
lithology: Sandstones
thickness: 7.5m
porosity: 18.3%
water saturation: 40%
permeability: 120mD
depth: 2800m
temperature: 90ºC
reservoir pressure (original): 240kg/cm2

3. field: JAF
location: Veracruz
distance to pipeline network: 5.8km
number of wells: 5
production period: 2009-2014
hydrocarbon: Dry gas
original volume of gas: 21bcf
cumulated production of gas: 11bcf
formation: upper Miocene
lithology: Sandstones
thickness: 8m
porosity: 26%
water saturation: 32%
permeability: 379mD
depth: 1650m
temperature: 60ºC
reservoir pressure (original): 126kg/cm2

4. field: SARAMAKO
location: Tabasco
distance to pipeline network: 14km
number of wells: 5
production period: 1978-2014
hydrocarbons: Gas and condensates
original volume of gas: 40bcf
cumulated production of gas: 34.6bcf
formation: Miocene
lithology: Sandstones
thickness: 36m
porosity: 18%
water saturation: 28%
permeability: 77mD
depth: 3470meter
temperature: 123ºC
reservoir pressure (original): 360kg/cm2


NG NETWORK PROJECTS

LINES
Colombia-Monterrey (Nueva Era)
Jaltipan-Salina Cruz

INTERCONNECTIONS
Montegrande
El Encino
Guadalajara
Pajaritos
Mayacan (Engie)

COMPRESSION STATIONS
Patzcuaro
Cempoala

_______________________________

Expert Services (ad)

TENDER ASSISTANCE
Aramoni provides Mexican and international companies
a set of specialized services in order to achieve
tender procedures and proposal compliance

DATA-ROOM SUPPORT
Aramoni in association with prime French geophysics EOSYS
offers to companies pursuing these contracts
independent expert services for reservoir assessment

Inquiries: info@aramoni.com
_______________________________


HVDC TRANSMISSION SYSTEM
Commissioner: CFE
Highway: Ixtepec Oaxaca - Yautepec Morelos
Distance: 600 km
Towers' height: 50m
Capacity: 3000 Mw
Contract
Object: HVDC transmission service
Type: international under Mexico's trade agreements
Scope: construction, operation, maintenance and transfer
Term:
Estimate: $1,700m
Tender
Status: IN PROGRESS
Ref: CFE-0036-CASOA-0001-2018
Public bid notice 13-Feb-2018
Clarifications meeting: 21-Jun-2018 ________ NEXT
Tender docs & contract clarifications
Final version of tender docs and contract
Proposal submission
Technical ruling and bid opening


PEMEX's MAJOR TENDERS

CHARTER OPPORTUNITY
Commissioner: Pemex PEP
Unit: semi-submersible drilling platform or drilling vessel
Water depth: +328ft
Drilling depth: +26500ft
Contract: 498-day charter
Location: GOM
Schedule
Public notice 17-Apr-2018
Tender docs & contract clarifications
Final version of tender docs and contract 25-May-2018
Bidder register by 4-Jun-2018
Proposal submission 8-Jun-2018
1.COSL
2.ENSCO
3.Marinsa-EPS (Pemex)
4.Sea Dragon
Technical ruling and bid opening 19-Jun-2018 ________ NEXT
Ruling 15-Jun-2018

SUPPORT VESSEL
Scope: Offshore reception and process
Term: 8.5 yrs
Tender
Status: IN PROGRESS
Ref: PEP-CAT-S-GCSEYP-00048956-18-1
Type: international under Mexico's trade agreements
Schedule
Public bid notice 5-Dec-2017
Bidder register: 5 thru 27-Dec-2017 (by email)
Prequal application: 29-Jan-2018
Prequal ruling: 14-Feb-2018
Tender docs & contract clarifications (notice pending) ________ NEXT
Final version of tender docs and contract
Proposal submission
Technical ruling and bid opening
Tender ruling
Qualified bidders
1.Blue Marine-Dowell Schlumberger
2.EMAS-Diavaz-KCO
3.FTapias
4.Expro Tool-Harren-Marinsa
5.TMM

E&P INTEGRAL SERVICES
Bloks
San Ramon & Blasillo
Tender
Status: IN PROGRESS
Ref: PEP-CAT-S-GCP-00049802-18-1
Type: international under Mexico's trade agreements
Term: 10 yrs
Schedule
Public bid notice 16-Nov-2017
Register 16-Nov thru 18-Dec-2017
Prequal ruling 26-Mar-2018
Pemex's clarifications 8-Jun-2018
Final version of tender docs and contract 14-Jun-2018
Proposal submission 26-Jun-2018________ NEXT
Technical and bid opening 27-Jun-2018
Auction & ruling 28-Jun-18
Qualified bidders list
1.Baker Hughes-Bently-Vetco Gray
2.Dowell Schlumberger
3.ENX Compressors-Ingenieria Subacuatica
4.Grupo R-AGR Petroleum Services
5.Iberoamericana de Hidrocarburos (Cobra)
6.GSM-Carso-SN-Sanchez O&G
7.Tracovesa-Cosafi-Interamericas-Blue Marble

_______________________________


OFFSHORE PIPELINE
Project
Ayatsil-B to Ku-A1 (line 16)
30in x 20km sour service
IPC and installation
Tender
Status: CONCLUDED
Notice: 15-Mar-2018
Bid proposals 16-May-2018
1.SapuraKencana-ESEASA: $84.97m
2.McDermott: $85.35m
Ruling 24-May-2018
SapuraKencana-ESEASA: $84.97m WINNER

TULA REFINERY: H-OIL PLANT
Project
Scope: Refurbishment & commissioning
Tender
Status: CONCLUDED
Notice 15-Mar-2018
Bid proposals 18-May-2018
1.SAIPEM: mxp 779.1m
2.OLRAM-CDI-PIC: mxp 848.2m
3.CI Cadereyta-CTAH: mxp 943.1m
Ruling 29-May-2018
SAIPEM: mxp 779.1m WINNER

ABANDONED WELLS
Scope: Reactivation & maintenance
Term: 6 yrs
Tender
Status: CONCLUDED
Ref: PEP-CAT-S-GCP-00054525-18-1
Type: international under Mexico's trade agreements
Schedule
Public bid notice 9-Nov-2017
Prequal ruling 14-Feb-2018
Bid proposals 2-May-2018
Ruling 7-May-2018
WELLS GROUP-1: Void
WELLS GROUP-2: Alpha Energy- Tavies Excavaciones: $5.66 WINNER
WELLS GROUP-3: Quimica Apolllo-Geolis-Sistemas Integrales Compresion: $4.17 WINNER
WELLS GROUP-4: Void


OFFSHORE DRILLING PLATFORMS
Project
ID: Kuil-C & Futura (2 light units)
Scope: IPC loading transport and installation
Tender
Status: CONCLUDED
Notice 30-Jan-2018
Bid proposals 7-May-2018
1.Bosnor-IPC (R): $47.3m
2.McDermott: $50.5m
3.SapuraKencana-ESEASA: $63.3m
4.COMMSA: $73.3m
Ruling 25-May-2018
Bosnor-IPC (R): $47.3m WINNER

_______________________________

This is a structural pipe commercial opportunity
We are the best providing market assistance to suppliers

Aramoni excels at these special services: (ad)
- Opportunity identification
- Development of contacts inside potential clients
- Presentation of company and products
- Getting information for quoting and clarifications
- Inclusion in short tender lists
- Proposal integration and submission
- Follow-up and closing

Contact us: info@aramoni.com
_______________________________

Next